Engr Emmanuel Sagoe Paintsil
Reservoir Engineer
- 8 year Industry Experience.
- Current Work – Cementing Technical Professional, Halliburton Ghana – 7 years.
- Reservoir Engineering Facilitator
Iran is closer to finding a way to circumvent the crucial Strait of Hormuz when it comes to oil exports. The Jask oil terminal, officially opened a few years ago, has seen but limited activity so far. However, recent satellite imagery reveals it has partially filled the facility with crude oil in what is being construed as a significant development in Tehran’s oil export strategy.
The importance of Jask has increased as of late as tensions with Israel grow. During periods of unrest, Iran has routinely threatened to shut down the Strait of Hormuz, a vital artery for oil shipments for several Middle Eastern producers. Unfortunately for Iran, it also relies on the Strait for its oil exports—but perhaps its leanings on the Strait is about to lighten up.
Jask could enable Iran to reduce its reliance on this narrow waterway, freeing up options for the country.
Jask has filled to about half capacity, imagery shows, but the facility’s challenges remain. The terminal was designed to load up to 1 million barrels per day and store 20 million barrels. However, only one of the three planned loading buoys has been installed, limiting its operational capacity. Kharg Island, Iran’s primary oil export hub, has in the past handled three times that volume, maintaining its status as the dominant outlet since the 1960s.
The most recent loading activity at Jask occurred from September 9 to 19, 2024, when the Iranian supertanker Dune loaded approximately 2 million barrels of crude. This marks the first significant loading at Jask since its initial trial runs in 2021, according to TankerTrackers.com, a firm specializing in monitoring Iran’s oil shipments.
The Jask terminal’s partial activity may signal a shift in Iran’s export strategies, aiming to bolster oil flows while mitigating the risks associated with the Strait of Hormuz.
Purchase the HSE in Oil and Gas application form at our Accra, Ghana Office
Cost of Application Form: US$50 (GHS800).
Office Address:
GOOGPro Ghana, GNPA Building Room 260 at Kokokomlemle, Near ATTC and Star Assurance, Accra.
Digital Address: GA – 0724744 Ghana.
Call +233 55 248 4485 or WhatsApp +233 54 159 5804
Completed application form must be scanned and submitted to careers@googpro.org on or before May 05, 2025; for training program starting May 12, 2025 and June 04, 2025;
for training program starting June 11, 2025.
Training and certification fee is US$600
Field work starts July 01, 2025 and August 01, 2025 respectively
Engr Emmanuel Sagoe Paintsil
Reservoir Engineer
Dr. Ahmed Zakaria Noah
PhD Petrophysics (Waseda University), M.Sc in Petroleum Geology, B.Sc in Geolog has accumulated 15 year of successful work experience in Oil and Gas drilling wells and well site Geologist, Data Engineer, Mud Logging Coordinator, Reservoir Engineer, Survey Engineer, worked in the areas of hydraulic fracturing in tight-gas reservoirs, MWD, Senior LWD Engineer, Direction Engineer along strong experience in Open Hole Logging Interpretation throughout overseas with different clients in different country locations.
Publications:
Mohamed A. Kassab and MostafaG.Temraz and A. Nooh: Preliminary Study of Capillary Pressure Derived Parameters: Lower- Middle Miocene- San El Hagar-1 well, East Nile Delta, Egypt. EPRI, Nasr City, Cairo, Egypt British University, Cairo, Egypt, 2012. Egy.J. Appl. Geophys., Vol. 11, No. 2, 201-217, 2012.
A.Z. Noah: Optimizing Drilling Fluid Properties and Flow Rates for Effective Hole Cleaning at High- Angle and Horizontal Wells, Journal of Applied Sciences Research, 9(1): 705-718, 2013
A.Z. Nouh, Mostafa Gouda Temraz, and El-Abbas Moustafa: Evaluation of Seepage Oil from Source Rock in the Southern Gulf of Suez, Egypt, 2013.Egy. J. Appl. Geophys., Vol. 11, No. 2, September 2012, 201-217
El-Abbas Moustafa, Ahmed Noah, and Adel Salem: Evaluation and Analysis of Oil Shale in Quseir-Safaga and Abu Tartur Western Desert, Egypt, 2014, Scirp-JSEMAT-1180219-20140316204601.
Ahmed Noah; Mostrfa Gouda Temraz and El-Abbas Moustafa EVALUATION OF SEEPAGE CRUDE OIL FROM SOIJRCI, ROCK IN TIIE SOUTI{ERN GULF OF SIIEZ, EGYPT, oI AppLS cL,28( 12)2 013.
Noah2, A., And Fathelbab3, S Pre-Drill Pore Pressure Prediction Using Seismic Velocities Aboashor1, N., El-Werr1, A. Egyptian Journal Of Geology, V. 58, 2014, P. 104-115, 2014. Pore Pressure Gradient Estimation Using The Modified D-Exponent Technique In El-Arish Area, North Sinai, Egypt. Aboashor1, N., El-Werr1, A., Noah2, A., And Fathelbab3, S. Egyptian Journal Of Geology, V. 58, 2014, P. 117-126.2014
Enhancement of yield point at high pressure high temperature wells by using polymer nanocomposites based on ZnO & CaCO3 nanoparticles., A.Z. Noah, M.A. El Semary b, A.M. Youssef c, M.A. El-Safty, Egyptian Journal of Petroleum (2016).
Using Nanomaterials to optimize Mud Rheology at HPHT wells throughout experimental work. A.Z.NOAH1, M.A.ElSemary2, A. M. Youssef3and M.A.EL- SAfTY4, International Journal of Innovative Research & Development, ISSN 2278 – 0211, Vol 5 Issue 4, www.ijird.com.
Reduction of Formation Damage and Fluid Loss using Nano-sized Silica Drilling Fluids, Adel M. Salem Ragab, and Ahmed Noah, Petroleum Technology development Journal.
A.Z. NAOH :Formation Evaluation and Lithology Determination for selected wells at Aghar Field, Western Desert, Egypt, , www.ijird.com May, 2016 Vol 5 Issue 6, ISSN 2278 – 0211 (Online), 2016.
Dr. Ahmed Nooh, PhD1, Dr. Carlos Monroy, PhD2, Michael Anwr Alphonse Anees, BS1, and Wafik Girgis, BS1: A Proposed Design for a Smart Shock Absorber Using an Electro-Rheological Fluid , 14th LACCEI International Multi-Conference for Engineering, Education, and Technology: “Engineering Innovations for Global Sustainability”, 20-22 July 2016, San José, Costa Rica. 2016.
Moataz Kh. Barakat (1)and Ahmed Z. Noah (2) Reservoir Quality Using The Routine Core Analyses Data of Abu Roash “C” in Badr El Din-15 Oil Field, Abu Gharadig Basin, North Western Desert, Egypt, 2016.
Nana Osei Kuffour Poku has over 10 years in the oil and gas industry specifically in drilling solutions, well construction and maintenance. He holds MSc Oil & Gas Engineering from Robert Gordon University, Aberdeen, Scotland. BSc Petroleum Engineering, KNUST, Ghana (West Africa). He worked at National Oilwell Varco (NOV), from 2012 – 2018 as drilling solutions engineer & account manager. He currently works at GNPC as a Petroleum Engineer. He is a member of SPE, Energy Institute and AGOGPro.
Send the following details to careers@agogpro.org
Mr Larry Wolfson has 34 years experience in planning and supervising and well construction, including ERD, slim-hole and subsea wells. He received a BS in mechanical engineering from California State University Northridge, an MS in petroleum engineering from the University of Tulsa, and he is a registered petroleum engineer in California.